Installing EV charging infrastructure shouldn’t mean endless permit revisions, code confusion, or project delays. At Solartro, we eliminate the complexity by delivering accurate, code-compliant, and approval-ready EV charging station permit plans that pass inspection the first time.
Whether you’re a contractor expanding into EV installations, a property developer future-proofing your facilities, or a business owner embracing electric mobility, we manage the intricate permitting process so you can focus on what you do best—installation and growth.
Our experienced team serves contractors, developers, businesses, and property owners across all 50 states, combining deep technical expertise with real-world permitting knowledge to deliver plan sets that get approved quickly and keep your projects moving forward.
Every design is precisely tailored to your site conditions, existing electrical capacity, and specific local code requirements.
Our comprehensive, submission-ready packages typically include:
Large-scale EV charging installations require more than standard residential drawings. Commercial and multi-family projects demand:
We've partnered with property management companies, commercial developers, municipal governments, and parking facility operators to deploy charging infrastructure that meets today's electric vehicle demands while preparing for exponential future growth.
Successfully installing EV charging infrastructure requires navigating:
Even a minor technical oversight—incorrect breaker sizing, missing equipment labels, improper load diversity calculation—can delay your project by weeks or require expensive field modifications. Our permit-ready designs eliminate these risks completely.
EV Charging Contractors & Installers: Scale your electric vehicle infrastructure business with reliable design support that keeps your installation crews productive, not waiting on permit approvals or dealing with rejections.
Property Developers & Managers: Future-proof your residential and commercial properties with professionally designed charging infrastructure that meets growing tenant demand and increasingly strict regulatory requirements.
Commercial Business Owners: Attract and retain EV-driving customers and employees with workplace and destination charging that's properly designed, permitted, and professionally installed.
Solar & Renewable Energy Contractors: Expand your clean energy service portfolio with integrated solar + EV charging solutions that maximize renewable energy utilization and customer value.
Municipal & Government Fleet Operators: Deploy public charging infrastructure and fleet charging facilities with designs accommodating multiple vehicles, specialized equipment, and public safety requirements.
Parking Facility & Garage Operators: Retrofit existing parking infrastructure or design new facilities with EV charging capabilities that meet current demand and scale for future growth.
The difference between smooth permit approval and costly rejection often comes down to critical details—accurate wire sizing, correct equipment labeling, precise load calculations, and jurisdiction-specific technical requirements.
Our team has successfully navigated hundreds of different AHJs across all 50 states. We understand which jurisdictions require structural calculations for wall-mounted chargers, which utilities need specific interconnection application forms, and which building departments expect conduit schedules formatted in particular ways.
Project Intake & Site Assessment: Submit your site address, electrical panel photos, site photos, and project requirements. We confirm jurisdiction-specific requirements and provide a clear timeline and quote.
Electrical Service & Site Analysis: Our engineers assess your existing electrical service capacity, determine upgrade requirements, identify optimal charger placement, and research your specific AHJ code requirements.
Professional Design Development: We create detailed site layouts, route conduit paths efficiently, perform comprehensive load calculations, and develop complete electrical diagrams optimized for your installation.
Engineering Review & PE Stamping: Licensed Professional Engineers thoroughly review all technical aspects of your plan set and apply required stamps for your jurisdiction's permitting requirements.
Quality Control & Final Delivery: Our QC team verifies code compliance and completeness before delivering your permit-ready plan set, properly formatted for your local AHJ submission requirements.
Ongoing Permit Support: If your AHJ requests revisions or clarifications, we handle all changes promptly at no additional cost. We support your project through to final approval.