At Solartro, we deliver permit-ready solar plan sets engineered to meet local AHJ, utility, fire, zoning, and electrical code requirements—helping solar installers and EPCs secure approvals quickly and install with confidence.
From residential rooftops to multi-megawatt commercial installations, ground-mount systems, battery storage, and generator integration—our designs are precise, complete, and approval-focused. Built to minimize revisions, reduce delays, and keep projects moving.
Fast turnaround. High approval rates. Nationwide coverage.
Every Solartro permit package is engineered, structured, and field-ready. We don't cut corners—our plan sets include every document, drawing, calculation, and specification your AHJ and utility require.
System Specifications & Equipment Datasheets:
Battery permitting can be complex—but Solartro simplifies it.
We turn complex battery permits into smooth approvals.
Commercial solar projects demand a higher level of engineering precision, regulatory coordination, and documentation accuracy. From complex electrical interconnections to structural load verification and fire code compliance, even small permit errors can lead to costly delays.
At Solartro, we deliver permit-ready commercial solar plan sets engineered to meet AHJ, utility, fire, and building department requirements—helping EPCs, developers, and contractors secure approvals faster and build with confidence.
From rooftop systems to ground mounts, carports, and energy storage, our commercial permit designs are accurate, code-compliant, and field-ready.
All residential components PLUS:
Permit-Ready Generator Plans for Reliable Backup Power
Power reliability is mission-critical—especially during outages, grid failures, and extreme weather events.
At Solartro, we deliver professionally engineered, permit-ready generator plan sets that simplify approvals and ensure safe, code-compliant generator installations for residential, commercial, and industrial projects.
Our generator permit designs are built to meet local AHJ, electrical, building, zoning, and fire code requirements, helping installers secure approvals faster and install with confidence.
High First-Time Approval Rate, NEC & Code Mastery
Complete In-House Engineering Team
Transparent, Efficient, and Designed for Installer Success